Second opinions and specialist input
Advisory and specialist opinions
When your question does not fit a standard report, ask us. Andrew Richardson, P.Eng. gives focused geotechnical opinions, reviews a specific condition, and works alongside your structural engineer or builder to answer the one thing you actually need answered.
What this is
The work, and what it answers
Not every geotechnical question needs a full drilling program and a bound report. Sometimes you need one condition looked at, a second opinion on a report someone else wrote, or a Professional Engineer to put a specific answer in writing in the form a builder, a lender, or a municipality asks for. This is the flexible service for exactly those situations: the things that fall between the standard investigation types.
Most advisory work happens alongside somebody else on your project. A structural engineer designing a footing hits a soils question. A builder opens an excavation and finds something the report did not mention. A designer or contractor needs a professional read on a ground risk before a decision is made. Andrew Richardson, P.Eng. slots in beside them, answers the geotechnical part, and hands a clear result back to whoever is carrying the design.
The scope is deliberately open. It can be a short site visit and a phone call, a review of drawings and a prior report, or a stamped opinion letter you can hand to a reviewer. Whatever the shape, the work is logged, analysed, and sealed by Andrew Richardson, P.Eng., the same as any report issued here. A short answer is still a professional answer, and he stands behind it.
One honest note up front: part of good advisory work is telling you when a quick opinion is not the right tool. If your real question is whether a lot can carry a septic system, that is a private sewage site evaluation with its own rules, not a letter. If it is bearing capacity for a pour, that is a foundation assessment. You will be told so, and pointed at the right investigation rather than sold a half-answer.
Method
What an advisory engagement looks like
Advisory work is scoped to a single question, not to a checklist. That keeps it fast and keeps the cost proportional to what you actually need. At the small end it can be a site visit, a look at the condition, and a short conversation with your engineer or builder. At the larger end it is a stamped opinion letter prepared as a professional work product for a reviewer, a lender, or a municipality.
What does not change is the standard of the answer. A one-page opinion gets the same care as a full report: what is observed is logged, analysed against the governing code or standard, and sealed by Andrew Richardson, P.Eng. If the question cannot be answered responsibly from what is in front of him, you are told what additional information or investigation would be required, rather than guessing.
- Focused site visits and condition reviews across southern and central Alberta.
- Independent review of an existing geotechnical report or set of recommendations.
- Sealed opinion letters and technical memos for reviewers, lenders, and municipalities.
- Direct input to a structural engineer, designer, builder, or contractor on a live project.
- A clear yes, no, or "here is what we would need" answer, in writing where it counts.
Working alongside your structural engineer or builder
Most of the buildings Andrew Richardson, P.Eng. advises on have a structural engineer of record who owns the design. His job is the ground: what the soil will carry, how it behaves with moisture, whether the material at founding level is native and undisturbed or fill, and what that means for the foundation. He gives the structural engineer the geotechnical parameters and the reasoning behind them, and they carry that into their design. Keeping that division clean is part of doing it properly.
The Canadian Foundation Engineering Manual (CFEM) and the National Building Code (2023 Alberta Edition) are the common reference points in these conversations, so the advice handed over sits on the same standards your engineer is already designing to. When a question is genuinely structural rather than geotechnical, he says so, and it stays with the person who owns that design. Being the specialist voice on one part of a larger project is a comfortable place to sit.
A second opinion on an existing report
If you have a geotechnical report in hand, a second opinion is often the most valuable hour you can spend before you rely on it. It is read the way a reviewer would read it: are the recommendations supported by the borehole and lab data actually presented, or do they outrun the evidence? Is the founding stratum and bearing value consistent with the logs? Were groundwater, fill, and any restricting conditions addressed? Does the field and lab program match what the site and the standards call for?
Soil description and classification carry a lot of weight here, so they are checked against the visual-manual practice in ASTM D2488 and the classification framework the report claims to follow. A second opinion can confirm that a report is sound and let you proceed with confidence, or it can flag a gap worth resolving before money is committed. Either outcome is worth knowing before, rather than after, the pour.
Field condition reviews, before you pour
Excavations reveal things drawings cannot. A footing trench opens up and there is a soft pocket, a seam of buried fill, organics, or standing water where the report expected firm native soil. That is the moment to get a professional eye on it, before concrete locks the decision in. Andrew Richardson, P.Eng. comes out, logs what is actually exposed, and gives you a call on whether it is founding-ready or whether it needs to be over-excavated and brought back up on engineered fill.
Any time the review involves opening or entering ground, the safety rules still apply: locates through Utility Safety Partners (Click Before You Dig) before anything is dug, and excavation practice under Alberta OHS Code Part 32. If the condition turns out to be more than a spot check can settle, it graduates into a proper foundation or soil-bearing assessment, and you are told that plainly rather than handed a sign-off on a subgrade that has not been proven.
When it is actually a private sewage evaluation
A common "quick question" is really a private sewage (septic) matter, and those have their own rulebook: the Alberta Private Sewage Systems Standard of Practice 2021. Two things routinely get misunderstood, so it is worth being clear about them.
First, the effluent treatment "levels" are quality classes, not a measure of how deep the investigation goes. Level 1 is primary treated effluent, straight from the septic tank; Levels 2 to 4 are progressively higher-quality secondary treated effluent. A higher level generally reduces the vertical separation the design must keep between the system and a restricting layer such as bedrock or a seasonal-high water table. Better effluent, less separation needed. It is a design driver, not an investigation tier.
Second, in Alberta the design is built from the soil itself, texture and structure described by the Canadian System of Soil Classification and mapped to a prescribed loading-rate table, with a minimum of two soil profiles and at least one excavated test pit. A percolation test is not the basis of design here; it can only be offered in support of a soil-based design, never in place of it. If a job runs beyond a standard evaluation, for example a larger or complex system, it is scoped accordingly, or you are pointed to a certified contractor from the provincial list.
If your question is really "can this lot carry a septic system, and what does it need," the right answer is a proper site and soil evaluation rather than a letter, and you will be told so. It is the honest call, and it protects you from a design that will not pass or will not last.
| Effluent level | What it means | Typical vertical separation to a restricting layer |
|---|---|---|
| Level 1 | Primary treated effluent (septic-tank output) | Commonly 1500 mm (5 ft) |
| Level 2 | Secondary treated effluent (higher quality) | Commonly 900 mm (3 ft) |
| Level 3 | Secondary treated effluent (higher quality again) | Commonly 900 mm (3 ft); as low as 600 mm (2 ft) only where disinfection is added |
| Level 4 | Highest secondary treatment quality | Commonly 900 mm (3 ft) |
How it is scoped and sealed
Every advisory engagement starts with pinning down the actual question, because a well-scoped question is half the answer. From there only what that question needs is done: a visit, a review, a short analysis, and a written result. You are not paying for a full investigation you did not ask for, and you are not getting a verbal maybe on something that needs to be in writing.
When the result is a sealed opinion, it is authenticated as a professional work product under the APEGA practice standards, and stamped by Andrew Richardson, P.Eng. That is what lets a reviewer, a lender, or a municipality treat it as it should be treated. Ask us the question first: reach the practice at 403 700 8672 or andrew@andrground.com, and you will get an honest answer on whether it is a five minute question or the start of a fuller investigation.
Logged and sealed by Andrew Richardson, P.Eng.
Typical profile, condition review (illustrative)
When you need it
The situations this answers
- A structural engineer or builder has a specific soils or foundation question part-way through a project and needs a geotechnical answer to keep moving.
- You have received a geotechnical report and want an independent second opinion before you rely on it, price from it, or build to it.
- A footing excavation has exposed something unexpected (a soft zone, buried fill, organics, or water) and you need a professional call before concrete goes in.
- A permit reviewer, lender, or municipality has asked a pointed geotechnical question and you need a sealed answer in the form they ask for.
- You are buying land or a building and want a professional read on a ground-related risk before you commit.
- You think you might need a private sewage (septic) site and soil evaluation but are not sure that is the right investigation, or how big it needs to be.
- A crack, movement, or settlement has shown up and you want someone to look at the likely cause before anyone commits to a repair.
Standards behind this work
See the full standards shelf- APEGA Practice Standards & Guidelines
- Canadian Foundation Engineering Manual (CFEM), 5th Ed.
- National Building Code, 2023 Alberta Edition
- ASTM D2488 Visual-manual soil description
- Alberta OHS Code Part 32 Excavating and Tunnelling
- Utility Safety Partners (Click Before You Dig)
- Alberta Private Sewage Codes and Standards (hub)
- Private Sewage Certified Contractors List
Need the ground looked at before you build?
Describe what you are building and where. You get a reply, usually within one business day, setting out what the investigation would cover.